A place to gather.
The plans place a community room at street level, with a gym, lockers and bicycle storage downstairs. A rooftop amenity area includes canopies and built-in benches.
Affordable rental housing · Meadowvale
A new corner
of everyday life.↓

Twenty-two rental homes, with the everyday comforts that make a place your own.
The four-storey development brings purpose-built rental housing to the corner of Winston Churchill Boulevard and Britannia Road West. Plans include one-, two- and three-bedroom homes.
Read the project coverage
The developer’s September 2026 interview describes a den in every home for working, studying or a quieter moment.
In-suite washer and dryer, a dishwasher, heating and air conditioning.
A gym, community hall and resident storage lockers are planned.
Planned features described by the developer in MPulse, September 2026.
From the architect’s drawings
Four original architectural drawings show how the building meets the corner, the street and its arrival spaces.
Original architectural drawings, sheets A051–A052, 6 September 2024. These progress drawings are marked “not for construction” and subject to revisions. They are not photographs of a completed building.
Inside the design
A closer reading of the September 2024 plans, with the focus on how residents would use the building.
The plans place a community room at street level, with a gym, lockers and bicycle storage downstairs. A rooftop amenity area includes canopies and built-in benches.
The site plan shows pedestrian connections to both streets, bicycle racks beside Britannia Road, and a barrier-free route from accessible parking to the west entrance.
Precast concrete gives the facade its vertical pattern. The elevations specify bird-friendly vision glass, while the arrival detail brings glazing and lighting to the covered entrance.
The September 2024 schedule contains 22 homes: nine one-bedroom, eight two-bedroom and five three-bedroom layouts. The mix includes homes with and without a den. MPulse’s later September 2026 interview describes a den in every home, so final layouts should be confirmed with the project team.
The 2024 drawing schedule and the developer’s later interview. These are dated design records, not a live list of available homes.
Illustrated perspectives
Renders based on the project drawings. Explore each view at full size.



Renders based on the September 2024 drawings above, which remain the design reference. Entrance, landscaping, lighting, planting and surrounding context are illustrative. Those drawings are marked “not for construction” and subject to revision.
Safwat Boulos · Local developer
Long-time local resident Safwat Boulos brings a software engineer’s background and a personal interest in real estate to this project.
In his September 2026 interview with MPulse, he describes a straightforward ambition: comfortable homes with useful space and everyday amenities.
Read the local storyAffordable living
does not mean
uncomfortable living.
An established community of parks, public spaces and places to learn. Here are a few places that make Meadowvale its own.
Trails, a fitness circuit and a fishing dock around the lake.
Books, community programs and a makerspace inside the community centre.
A place for recreation and community activities overlooking Lake Aquitaine.
A local project supported through affordable housing initiatives at the City of Mississauga and Peel Region.
A City public notice describes the original four-storey, 20-unit proposal. Later records identify 22 homes.
City planning record ↗Peel Regional Council approves an affordable rental funding agreement with applicant 2421845 Ontario Inc.
Council record ↗The development is included in reporting on Mississauga’s affordable rental housing investments.
UrbanToronto coverage ↗Local reporting describes the home features and the developer’s aim to welcome tenants before the end of 2027.
MPulse interview ↗Affordable units in the City’s current Community Improvement Plan listing.
City program listing ↗These are separate program figures for the same development, not numbers to add together. Public records do not establish a combined total here.
Good to know
No. The page includes the original architectural drawings from September 2024 and renders based on them. Neither is a photograph of the completed building; final construction details may differ.
Public City and Peel records name 2421845 Ontario Inc. The September 2026 MPulse story identifies local developer Safwat Boulos.
Start with the MPulse developer interview, the Daily Commercial News funding report and the dated City and Peel records linked above.